Sisk instructed Concast to provide a Precast frame solution for this impressive 17 storey 250 bedroom hotel, located in the heart of Birmingham City Centre. The ground, first and second floor levels were constructed in steel and insitu concrete creating a transfer deck at level two, with the entire frame for floors 3-17 constructed with a Precast cross wall solution. The Precast design included a bespoke floor slab along with all access stairs and lift cores. A high quality finish was required to all exposed internal Precast which was given only a spray paint finish. Access and site storage were very restricted requiring meticulous planning to ensure that every load was delivered to site just-in-time and stacked-in-sequence. We have worked with Sisk on a wide variety of project types and sizes over many years including award winning projects at Croke Park Stadium, CIT Cork School of Music and St Annes Milltown.
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.