Mclaren timelapse video of Concast at Asda Rdc Rochdale

This major RDC project is now complete and operational. McLaren Construction have posted a timelapse video showing Concast erecting a line of 15 freezer dock pods and 28 standard insulated dock levellers for the chilled area, click on the YouTube link to view. Concast provided a total of 125 insulated dock levellers along with insulated retaining walls.

http://www.youtube.com/watch?v=jwnF6IA TamA

 

» Return to News Homepage