Concast win major project with Volkerstevin’s £150m reconstruction of Southampton’s Containor Port

VolkerStevin are reconstructing berths 201 and 202 to form a new quay in preparation for the arrival of the next generation of ultra-large container carriers at the Port of Southampton.

The initial £80m phase involves the construction of a 500m quay wall with a 16m draft. Concast supplied 248 separate Fender and Coping Units ranging in weight from 17T to 48T. All exposed surfaces were produced using Zemdrain controlled permeability formwork liner.

Bespoke fender unit steel mould

» Return to News Homepage